Asphalt News
-
NASCAR.COM - Repaving project a testament to technology - Aug 25, 2010
Tags: -
Flagler Asphalt Trail Ahead of Schedule
Tags: -
Road Construction Cited as the Economic Salvation for Central Florida | TheLedger.com
Tags: -
Wellbeing Lower Among Workers With Long Commutes
Tags: -
Connector road expected to bring relief to Crestview traffic | crestview, road, bring - News - Northwest Florida Daily News
Tags:
| Asphalt pavements require about 20 percent less energy to produce |
|
|
|
|
Asphalt pavements require about 20 percent less energy to produce and construct than other pavements. Rubblization of concrete pavement with an asphalt overlay also saves energy. The rubblized pavement does not need to be hauled away; new base material does not need to be trucked in; and landfill space is saved. In addition, the need for mining, crushing, and processing of virgin materials is reduced. |
Upcoming Events
- 34th Annual Asphalt Conference
September 13, 2010 - September 14, 2010 - FDOT Letting
September 29, 2010 - D4, 6, & Turnpike Contractor's Meeting
October 12, 2010 - D1 Contractor's Meeting
October 13, 2010
Did You Know?
-
Asphalt pavements require about 20 percent less energy to produceRead more...
Our mission is to improve the quality of asphalt and expand its use.







